Two or more customers who own a micropower plant and have the right to request a new connection to the distribution network of the power plant they own. If you want to connect the power plant you own to the JSC "Telasi" distribution network, you must register on the website of JSC "Telasi" http://my.telasi.ge/. Click on the "Service" window and select "Subscribe" in the drop-down box and after opening the latter, you will select "Connecting a micropower plant to the grid", and then you will select the field "One new user", where you will see the service fee, connection terms and the application form approved by Semek, all fields of which are mandatory. Please attach the necessary documentation and the payment order confirming the payment of the joining fee to the fully filled application. After that, you will be given the opportunity to send the mentioned application to Telas JSC and your application will be accepted for processing. Articles 21 and 22 of Semek Resolution N19 of June 28, 2021 regulate the procedures for connecting two or more new users to the micropower power grid. And the application form for this connection is: "Request for connection of two or more new facilities and micropower power plant to the distribution network".

Two or more new customers Sub-section 1.2 is calculated in the same way as 1.1 and to the resulting fee is added the smart meter installation fee specified in Annex 4 (column #5) for each customer.

Terms and fees for setting up the accounting node

List of multifunction electronic meters:

  1. CE308 S34.746.OG.QYUVLFZ GS01 - 5(100) A, 3x230/400V, 50Hz, three-phase electronic meter, accuracy class 1.
  2. CE208 S7.846.2.OG.QYUVFLZ GS01 - 5(100) A, 3x230V, 50Hz, single-phase electronic meter, accuracy class 1.

The meters are included in the register of types of measuring instruments legalized in Georgia, certificate No. 005-16-TR, 23.05.2016. and certificate No. 009-16-TR, 10.10.2016 According to the decision N16/1 of the National Energy and Water Supply Regulatory Commission of Georgia dated April 15, 2022:


Application form for connection of two or more new facilities and micropower plants to the distribution network